The final countdown

A huge amount of progress to report on this week - the light and electrical install has almost been completed and we are really happy with the choices we made for the light fittings.

We were also really surprised to find that the oven and cooktop had been installed as we were expecting that they wouldn't have been done until handover, but still it was good to see them in.

All up the progress to report this week is:

-- Light fittings 99% installed
-- Home theatre painting almost complete
-- Smoke alarms installed
-- Extractor fans in bathrooms and laundry installed
-- Powerpoints and light switches installed
-- Bathroom mirrors installed
-- Bath in main bathroom installed
-- Showerheads and showerscreens installed
-- Bathroom sinks and taps installed
-- Ovens,microwave, cooktop and rangehood installed


The ovens/microwave installed

the electric cooktop

The overview of the kitchen with all of its new additions, can't wait for it top be dust free!

The Asteroid light fitting in the living room, the poor electricians having to screw in each of the arms...

Looking towards the back of the home theatre

looking towards the front of the home theatre, not sure where the silver cover is for the left hand wall light though...


The hallway, thankfully the yellow on the smoke detector is only the temporary dust cover
The stair lights

The double shower in the main ensuite with the heated towel rail waiting to be installed

The sink area of the main ensuite

the saturn light switches that we have throughout the house, we went for black ones in the home theatre

A big thumbs up to Palmline Electrical too for being good enough to do the cutouts for our speaker wire wall plates in the home theatre whilst they were installing the lights.

What we think still needs to be done:



-- Spa bath to be installed in main ensuite
-- Painting home theatre, stairway and exterior
-- Dishwasher to be installed
-- Aircon fitout
-- Plumbing
-- Carpet
-- PV panels for solar power
-- glass shelves in the showers
-- Toilet roll holders and towel rails
-- hanging of the remaining doors
-- Door handles